read more |
|
Add To Basket |
- 2 x Extra Long 3 Meter PS3 Charging Cable (9.8 FT approx)
- High quality cable with built in ferrite bead for reduced interference.
- Gold plated connectors - 4 pin USB A to 5 pin Mini USB B connection.
- Simultaneously charge and play at the same time - cable allows continued gameplay
- Compatible with other devices such as PSP 1000/2000/3000 & Digital Cameras
Description:
Value twin pack
Assecure Pro Gold Plated Extra Long length USB charger cable for Sony Playstation 3 (PS3) controllers.
Never miss out on the action again, continue playing even when your controller is plugged in to charge.
Simply plug the small end of this cable into your PS3 controller and then insert the other end into your PS3 console to charge.
Also allows you to transfer data to and from your PSP console (PSP Go / Vita NOT compatible) Show more Show less
Pegi Rating:
Suitable for people aged TBD and over.Genre
TBDCustomer Rating:
SKU:
717710-productOur Warehouse team are working hard to process all orders whilst operating in line with strict guidance on social distancing. Once your order has been processed and is ready to be shipped delivery timescales will apply. You will receive notifications on the progress of your order by email.
Please note: Click & Collect is currently not available in England or Wales.
We have a wide range of Delivery options, please see the table below.
Delivery type | Delivery Time | Cost |
---|---|---|
Standard Orders | 2 working days** | £4.99 |
Pre-Orders | 1 working day** | £4.99 |
Priority Insured* Pre-orders For Playstation 5, Xbox Series X|S | 1 working day** | £19.99 |
Console Pre-orders For Playstation 5, Xbox Series X|S | 1 working day** | £14.99 |
Console Pre-orders For Playstation 5, Xbox Series X|S | 2 working days** | £9.99 |
Next Day incl. Saturday (Royal Mail Tracked 24) | 1 working day** | £7.99 per order |
Next Day (DPD Tracked) | 1 working day** | £9.99 per order |
Next Day (pre 12pm) (DPD Tracked) | 1 working day** | £11.99 per order |
Saturday (DPD Tracked) | 1 working day** | £10.99 per order |
Click & Collect | 1-2 working days | £4.99 (Pay online, delivered to store, plus receive a £5 voucher to spend in store when you collect) |
Click & Collect Console Pre-Orders PlayStation 5 and Xbox Series X | S | 1-2 working days | £9.99 per order (Pay online, delivered to store, plus receive a £5 voucher to spend in store when you collect) |
Click & Reserve | 2 hours from order | FREE (Order online, pick up and pay in store) |
For items ordered from Marketplace sellers, please refer to their specific delivery types, times & cost |
Small Print
• Order up to 4pm for next day delivery and up to 7pm for same day dispatch
• Orders placed before 7pm receive next day dispatch. Monday to Friday, except on Bank Holidays.
• Orders placed after 7pm Friday to 1pm Sunday will be dispatched Sunday
• Whilst we will do everything we can to meet the delivery times above, there may be factors outside of our control and we cannot guarantee delivery within this timeframe
• Working day definition: Monday-Friday (Excludes Weekends and Bank Holidays)
• Digital purchases are excluded from the total order value for tracked courier services.
*Subject to customer submitting a Royal Mail Lost in Transit claim via GAME customer services and Royal Mail validating such claim, Priority Insured Delivery entitles customer to either;
a) a free of charge replacement console, and a partial refund of £50 to the original method of payment; or
b) a full refund of the price paid for the console ordered and the £19.99 delivery charge (payable to original method of payment), together with £50 compensation (payable at customer’s choice, either by BACS, Cheque or onto a GAME Gift card).
Please note that Royal Mail’s Lost in Transit claim procedure can take up to 21 days to complete.
**Remote Area Delivery Times
• Deliveries to non-mainland UK addresses and remote locations (such as the Scottish Isles, Isle of Man, Isle of Wight, Northern Ireland and the Scottish Highlands) may take longer to reach you.
To see all of our delivery options click here
Sign up for a GAME Reward Account online for FREE, via the GAME App or in your local store.
Earn points whenever you trade-in or buy at GAME. Use your points to save on the stuff you want in-store.
Join GAME Elite today and earn up to 10% points back with GAME Elite - Our exclusive membership service from GAME. With extra points and more cash to spend, this deal is seriously on point.
Our promise to you - you can’t lose – join today and if you receive less points back from purchases than the fee you have paid for your membership for 12 months, we will give you the difference back in points.
Receive exclusive deals and offers and we will even send you a gift around your birthday.
Terms and conditions apply
Please note: You will not receive Reward points for your purchase of GAME Elite Membership